This retail build-out was the fourth we have done for Body Details (since then we have done a fifth). We had to demolish an existing salon and convert it to match the Body Details’ design used at all of their locations in 90 days.
Some of the unique challenges included accounting for the existing high ceiling which was atypical of this type of retail interior buildout in South Florida. Additionally, we had to make the existing HVAC work to keep the entire project within the budget.
Some of the work included relocating plumbing lines, adjustments to the fire sprinkler system, adding exhaust fans as required for client’s operations, and new flooring, walls ceilings, lighting, as well as the wave wall and front desk used at all Body Details locations.
We finished the project in 84 days on budget.